The objective of the substation audit was to provide site with a non-intrusive evaluation of all High Voltage (HV) equipment for all of their substations. Identification and clear documentation of […]
The key objective of the project was to reduce the aged/obsolete switchgear that was calculated to have a lower fault current rating to that of the network, and required the […]
The key objectives of the project were to increase equipment reliability and reduce the likelihood of HV incidents by replacing two 40+ year old HV switchboards. The installation of remote […]
The key objective of the project was to improve plant reliability by replacing the obsolete ZA6 and ZA8 air compressors with new 11kV 900kW Atlas Copco ZH15000 two stage turbo […]
The key objective of this project was to reduce risk to High Voltage (HV) equipment operators by removing them from potential ‘Line of Fire’ safety risks that prevailed whilst operating […]
Client Representative for Stage 2 Upgrade (July 2012 – May 2013) FCEng Scope Design Scope: Establishing High Level Design Criteria for Upgrade. Setting up of PLC design standards. Resolution of […]
Complete upgrade/replacement of the Acid Plant Pre-heater gas train instrumentation and process control system. FCEng Scope Project Management from project initiation to handover to Operations. Schedule management was deemed critical […]
Upgrade the four existing site Furnace Reaction shaft oil burners to oxygen fuel burners where high purity oxygen (typically 95% oxygen) is supplied to the central burner tubes. This provides […]